You are seeing the first wall of Tesla Giga Berlin. This is the first prefabricated wall. As you know Tesla is using prefabricated construction materials at Giga Berlin this is why the construction is moving ahead with astonishing speed.
Tesmanian reports.
Only nine months have passed since the announcement of Giga Berlin construction, and we can already see the outlines of some buildings. Since receiving the needed permits, Tesla has done a lot of work. A few days before the end of July, all columns were installed for the Drive Unit building. The progress went even further: the installation of walls and roof structures began on the building. Today we can see that the number of roof structures has increased significantly and further wall installation continues.
Armen Hareyan is the founder and the Editor in Chief of Torque News. He founded TorqueNews.com in 2010, which since then has been publishing expert news and analysis about the automotive industry. He can be reached at Torque News Twitter, Facebok, Linkedin and Youtube.